Before the paving starts, a gooey liquid substance is sprayed on the right and left side of the road but not the middle. The asphalt is 300 degrees when it is loaded into the dump trucks at the factory (I don't know where that is). When it gets here, the truck is skillfully backed up to the front end of a machine I call the paver. The front end of the paver is equipped with something like crabs claws which are opened to receive the load from the rear of the dump truck.
The truck and the paver look like they become one machine as they both creep down the street, with the hot asphalt dumping into the paver's front end and coming out the paver as 2" think roadway. The paver can pave up to 4" thick. After the dump truck empties it's load, the "claws" of the paver close up so that more paving material is forced into the paver's machinery. Another dump truck is soon backed up and the paver and the claws open up again.
paving. Another operator steers the machine along the edge of the road (in our case, the curb) and constantly signals the truck driver to raise or lower the dumper of the truck to keep material flowing out of the truck.
2 comments:
Thank you for the wonderful pictures and the fascinating commentary. I wish I could have seen it. From the pictures, it looks really great. Special thanks to Dennis Goldsby for overseeing the repair process, a longtime community need.
KLau
Thanks for the update. Appreciate everyone's work on the project and the information.
Mike and Sue
Post a Comment