Our next community work party is scheduled for September 9, 2023. We have several projects planned that will need to have plenty of people available to help complete the projects. Please mark your calendar now for September 9th - 9:00 am - 1:30 pm and let us know what project you would like to help with.
- Water Shed - Working with others, under Dana and/or Pete's guidance, finishing building a ramp from the stairs continuing to the door of the pump house. Basic carpentry skills a plus.
- Steps - We are planning to add a section of steps on the slanted grade from the road down to the beach house. Bob Falk will be providing leadership and guidance. Ability to lift small landscaping blocks and put into place will be helpful on this project.
- Meter Reading - We will be checking the meter readings at each residence. Requires working in teams of 2, bending, lifting metal covering over meter and recording numbers.
- Staining - We will be refreshing the stain on the pier. Although the pier will still be in use during the work party we will begin staining any areas such as rails, etc that can be stained while still in use. We will complete project at the end of the season.
- Vegetation - We will be weeding and cutting back vegetation at the beach and on each of the community roads.
- Entryway - On each side of the community entry there are landscaping blocks that need to be reset.
- Community Signs - Shorehill signs at entryway need maintenance and/or repair. May also require painting.
- Mailbox Structure - Assess posts for any maintenance and/or repair needs. Clean boxes.
- Chains - Replace deteriorating covering on chains at roundabout/boat launch. Check locks for any needed preventive maintenance.
- Signs - Replace Alta Vista Road sign and check others for any needed maintenance. Check NO DIVING/NO PARKING signs and secure as needed.